How to install an automatic bollard?What tools are needed to install rising bollards?
Usually, like guardrails, fixed bollards, etc., do not need to do the drainage system, only need to simply dig holes on the construction, this is very easy, as long as the construction ability of people can do. The construction of automatic rising bollard is relatively troublesome, not only need to know in advance whether it is suitable for construction, because the need for excavation depth is relatively deep, civil construction is only part of the construction, but also need to connect electricity, the commissioning of the control system, etc..
2, Construction process: drilling, trenching, making permeable layer, wiring, placing bollards, adjusting level, commissioning equipment, backfilling sand and soil, road restoration.
3, after-sales service: after the installation is completed, we have to do regular maintenance of the bollards, replace the rusty parts and check the operation of the control system.
The picture is the general need to do the drainage system of the automatic rising bollards installation effect, from the picture can be seen how to install the bollards, and may need to use the accessories.
call us :
+86 18206096507 e-mail : [email protected]